What are movable and unmovable operations ? |
   Unmovable operations are operations assigned to a particular workstation and which can not be moved elsewhere by the automatic line balancing tool. Unmovable operations have their station number drawn in red as shown in the following figure.
While the unmovable status constraints the assignment of an operation to one particular workstation, it is also possible to constrain an operation to a set of workstations, with zoning constraints.
|